Welcome to AKCM's showcase! Here, we proudly present our  projects, each with its own distinctive story and impact. Our work reflects our commitment to excellence and creativity. Take a moment to explore and get inspired by the diverse range of projects we have undertaken. We believe in the power of  engineering  and aim to share  our projects to provide a deeper understanding of our capabilities and dedication.

qazigund_1650783943988_1650783966123.webp

01

Quazigund Banihal Tunnel, Length 16 .268 Km Including twin tunnel (8.5 kms) 2nd longest tunnel of India in Jammu & Kashmir, India

Project Name: Technical Consultancy for Design audit, Road Safety Audit, Design of standard operating procedure for emergency preparedness, response and evacuation plan; Capacity building and workshop for Tunnel safety - Four Lanning of Quazigund to Banihal Section of NH-1A from Km 189.35 to Km 204.70 including Twin Tube Tunnels on NH-1A on BOT (Annuity Basis)” in the in the Union Territory, Jammu & Kashmir of India

​

​Client: NEC ( Navyugya Engineering Company limited ) 

02

Project Name

Project:  Thrissur Expressway , Kerela, India ( 28 kms Thrissur - Vadakkanchery) 

​

Project Name: Technical Consultancy to client for investment as  lender in the Thrissrur Expressway Limited on various regulatory and technical approvals including road & tunnel safety aspects, technical and regulatory  compliances and approvals of NHAI.  

​

​Client: India Resurgence Asset Management Business PVt LTd  (INDIA RF)

 

India Resurgence Fund (IndiaRF), promoted by Piramal Enterprises Ltd and Bain Capital Credit, along with international co-investors, infused an investment of $75 million (about Rs555 crore) in Thrissur Expressway Ltd (TEL), a part of Hyderabad based KMC Constructions Ltd (KMC). The investment  restructured TEL’s existing debt and for last mile financing to enable project completion 

Thrissrur Expressway.JPG
Nayara Energy.jpeg

Nayara Energy Refinery - India's Second largest single site Refinery 

​

Project :  Technical Consultancy on the National Highway no. 151-A in the State of Gujarat fror Detailed Transportation/ Mobility plan for Nayara Energy Establishments by   Conducting Surveys & Investigations, Feasibility Study, Detailed Project Report (DPR), Detailed Design of Junctions, R.C.C. Grade Separator Structures - [VUP, Flyover/Viaduct], Service Road, Road Safety Audit, EPC Work of Junction Improvement and Supervision & Monitoring In Short Road Engineering Solutions, Access permission for a For Nayara Energy Limited.

​

​Client: Nayara Energy Refinery, Jamnagar Refinery, Gujarat ,India 

04

Project Name

Project : Road Safety Consultancy for - Four laning of Krishnagiri to Thumbipadi section of NH-44 from Km.94+000 to Km.180+000 under BOT(Toll) basis under NHDP Phase-II in the state of Tamil Nadu. Four laning of Thumbipadi to Namakkal section of NH-44 from Km.180+000 to Km.248+625 under BOT(Toll) basis under NHDP Phase-II in the state of Tamil Nadu. Four laning of Namakkal to Karur from Km.248+625 to Km.292+600 of NH-44 under NHDP Phase-II in the state of Tamil Nadu.

 

​Project Stage & Length :  O&M , 198.6 kms

​

Client: NHAI, Govt of India. 

​

NH 44 Kirshnagiri Thumbipadi.jpeg
Puducerry N5 45 A.jpg

Project : Road Safety Consultancy for - Four laning of Villupuram (Km.0/000) to Puducherry (Km.29/000) section ofNH-45A (New NH-332) on HAM under Bharatmala Pariyojana (Under residual NHDP-IV) in the state of Tamil Nadu and UT of Puducherry - Package I (ii) Four laning of Puducherry (Km.29/000) to Poondiyankuppam (Km.67/000) section ofNH-45A (New NH-332) on HAM under Bharatmala Pariyojana (Residual Works NHDP) in the state of Tamil Nadu and UT of Puducherry- Package II (iii) Four laning of Poondiyankuppam (Km.67/000) to Sattanathapuram (Km.123/800) section of NH-45A (New NH-332) on HAM under NHDP Phase IV in the state of Tamil Nadu - Package III

​

​Project Stage & Length :  Construction , 123.800

​

​​​​​Client: NHAI, Govt of India

01

02

​

Project : Road Safety Consultancy for - construction of access controlled 4 Lanning with paved shoulder on NH -275 on the Hybrid Annuity Model under NH(O) on following 4 sections of Mysore to Kushalnagara sections in the State of Karnataka: .

​

Project Stage & Length :  Design  (Development) & Construction , 92.335 kms

​

​​​Client: NHAI, Govt. of India

NH 275 mysore Khuslanagara.jpg
Bikaner Phalodi.jpg

Project : Road Safety Consultancy for - during O&M stage for Widening & upgrading of the existing Bikaner-Phalodi Section to 4-lane from km 4.200 to km 55.250 and 2-lane with paved shoulder from km 55.250 to km 163.500 of NH-15 on BOT (Toll) Basis in the State of Rajasthan

​

​Project Stage & Length :  O&M, 159.3 kms 

​

 â€‹â€‹â€‹â€‹â€‹Client: NHAI, Govt. of India

04

Project Name

Project : Road Safety Consultancy for - Construction of 4 lane Access Controlled New Greenfield Highway Section of Mancherial to Warangal of NH- 163 G from Narva village at Ch.3.834 Km to Oorugonda village at Ch.112.240 Km 

​

​Project Stage & Length :  Design  (Development) & Construction , 108.406 kms

​

​​​​​Client: NHAI, Govt. of India

​

national-highway-163 Warangal Mancherial.jpg
Riyadh Suadi Arabia.jpeg

Project : Consultancy services for Road Safety and Design for Roads in Riyadh, Saudi Arabia for KPMG 
Advised Saudi Government officials at Riyadh on matters related to Road Safety, Traffic Management, Cost reduction &Maintenance etc.

(Project Length: 50,500 km of 4/6/8-lane Highway and Expressways,

Project Cost: INR 40,000 Cr​​​

​​​​​Client: KPMG, Riyadh , Saudi Arabia 

01

02

​

Project : Consultancy Services on Assessment of Job Potential and Skill Development Needs in Road Sector for Ministry of Road Transport and Highways, Govt. of India for Ernst & Young.

 

Project Length: 35, 00 km of 4/6/8/ Highway and Expressways,

 

Project Cost: INR 5,35,000 Crore

​

​​​Client: Ernst & Young , India

MoRTH rpad stretch.jpeg
vadodara-mumbai-expressway_0_1200.jpg

Project : Crash Investigation, Traffic Management System and conducted Road Safety Audit (Risk Management) of Highways from Guna, Madhya Pradesh to Vadodara, Gujarat

 

Project Length: 623 km, 2/4-lane,

 

Project Cost: INR 1,680 Crores

​

​Client : IRTE , Nayara , Reliance Industries 

04

Project Name

Project : Crash investigations, Traffic Management System and conducted Road Safety Audit (Risk Management) of Highways from Jamnagar – Hathras (Gujarat, Madhya Pradesh, Uttar Pradesh and Rajasthan);
 

Project Length: 1299 km, 2/4-lane,

 

Project Cost: INR 3,637 Crore for IRTE

​

​​

​​​​​Client: IRTE , Nayara , Reliance Industries â€‹

Hathras Jamnagar.jpg
Other noteworthy Consulting assignments  

​

  • Advisory to GLG group for various project

  • Road Safety Audit , awareness & capacity building for IRTE – Reliance and Nayra project

  • Consultancy services for World bank on Road Safety & India state support Program

  • Consultancy service for road safety awareness & capacity Building for Muskaan in odhisha

​

​

World Bank logo.bmp
GLG group.png
“Success  is a collaborative effort, where dreams are brought to life through teamwork and dedication.”

AKCM TEAM

Engineering  & Management Consultants

CONTACT US

Reach out with any
questions or inquiries

Thanks for submitting!

ADDRESS

Regd. Address: 16 Sukhdev Vihar

New Delhi 110025 

​

Corp Address : B 10 Sector 7 

Noida 201 301 

PHONE

(+91) 987332231,9810290427,9718609192

EMAIL

  • Facebook
  • LinkedIn
  • Twitter

© 2035 by EGK.
Powered and secured by Wix

bottom of page